PREVIOUS EXPERIENCE
Unibon, Puerto Rico, 2023
​​
Templeton Power was brought onto this project to replace the existing concrete and wood poles in this region of Puerto Rico. The route was 6.5 miles of 25kV distribution conductor and over 400 structures, each to be replaced with a suitable steel or concrete pole.
​
Southern California Edison (SCE) Tower Model Review, SCE, California, USA, 2023
Templeton Power engineers have worked on projects reviewing 66kV to 500kV PLS TOWER models, and verifying the accuracy against existing
legacy drawings. Modifying new Tower extensions or adjusting the Tower models when any inaccuracies are found was also part of the scope. Working to ASCE 10-15 amongst other applicable standards for all tower requirements.